INTERIORS
Interior ceiling works
Metal-frame ceiling and moisture-resistant board installed ahead of final finishes.
- SECTOR
- Commercial interiors
- DISCIPLINE
- Interiors
01 / THE SITUATION
New rooms needed clean, level ceilings that could be closed up neatly around services, vents and detectors.
02 / SCOPE OF WORK
- 01
Metal framing set out and levelled to the ceiling layout.
- 02
Moisture-resistant plasterboard fixed in sequence across the framing.
- 03
Openings left for the air vent, smoke detector and other services.
- 04
Surfaces left ready for jointing, painting and final finishes.
FROM THE SITE / 02 PHOTOS

NEXT STEP
Facing something
similar?
Every building is different, but the questions are often the same. Let us take a look.
Request a site assessmentYOUR BUILDING, OUR NEXT CONVERSATION
Start with
a clear view.
Share the challenge. We will help you decide the next sensible move.