CORE CUTTING & DEMOLITION
Core cutting in a live hotel
New openings and controlled demolition carried out floor by floor, without disturbing guests.
- CLIENT TYPE
- Hospitality
- LOCATION
- Downtown Dubai
- DISCIPLINE
- Core cutting & demolition
- YEAR
- 2024
- DURATION
- 5 weeks
01 / THE CHALLENGE
A hotel refurbishment needed new shaft openings and partial slab removal while the rest of the building stayed open to guests. Noise, dust and vibration all had to be tightly controlled.
02 / OUR APPROACH
- 01
Work windows agreed with hotel operations, with the loudest tasks in the quietest hours.
- 02
Wire-saw and diamond core cutting instead of breakers, to keep vibration low.
- 03
Negative-pressure dust enclosures and water slurry capture on every floor.
- 04
Temporary propping designed and checked before any section was released.
03 / THE OUTCOME
All openings were completed within the agreed hours, with no guest complaints logged against the works.
NEXT STEP
Facing something
similar?
Every building is different, but the questions are often the same. Let us take a look.
Request a site assessmentYOUR BUILDING, OUR NEXT CONVERSATION
Start with
a clear view.
Share the challenge. We will help you decide the next sensible move.