CONCRETE REPAIR

Car park deck repair & waterproofing

Leaking joints and worn decks repaired and sealed, level by level, with the car park kept in service.

CLIENT TYPE
Multi-storey car park
LOCATION
Al Barsha
DISCIPLINE
Concrete repair
YEAR
2023
DURATION
10 weeks

01 / THE CHALLENGE

Water was getting through movement joints and cracked decks, staining soffits and corroding steel below. Closing the car park was not an option for the building's tenants.

02 / OUR APPROACH

  1. 01

    Deck survey with cover-meter readings and chloride sampling.

  2. 02

    Crack injection and movement joint replacement on each level.

  3. 03

    Localised concrete repairs before applying a trafficable waterproof deck coating.

  4. 04

    Re-lining and signage reinstated so each level returned to use immediately.

03 / THE OUTCOME

The leaks stopped, the decks were protected against further chloride ingress, and tenants kept parking throughout.

6LEVELS TREATED
640LINEAR METRES OF JOINTS
10WEEKS, LEVEL BY LEVEL

NEXT PROJECT

Podium slab restoration

Dubai Marina · Concrete repair

NEXT STEP

Facing something
similar?

Every building is different, but the questions are often the same. Let us take a look.

Request a site assessment

YOUR BUILDING, OUR NEXT CONVERSATION

Start with
a clear view.

Share the challenge. We will help you decide the next sensible move.

WHATSAPP