CONCRETE REPAIR

Podium slab restoration

Spalled soffits and corroded reinforcement across a podium deck, repaired while residents stayed in place.

CLIENT TYPE
Residential tower
LOCATION
Dubai Marina
DISCIPLINE
Concrete repair
YEAR
2025
DURATION
14 weeks

01 / THE CHALLENGE

Years of chloride exposure had left the podium soffit with widespread delamination and exposed, corroding reinforcement. The building was fully occupied, the car park below had to stay open, and the client needed a repair that would last rather than another patch.

02 / OUR APPROACH

  1. 01

    Hammer-tap and half-cell survey to map delamination and active corrosion zones.

  2. 02

    Phased breakout in controlled bays, keeping two thirds of the car park in use at all times.

  3. 03

    Rebar cleaned to bright steel, treated, and supplemented where section loss exceeded limits.

  4. 04

    Polymer-modified repair mortar applied in layers, followed by a migrating corrosion inhibitor and anti-carbonation coating.

03 / THE OUTCOME

The podium was handed back on programme with a documented repair map, so the owners now know exactly what was done and where to look at the next inspection.

1,850M² OF SOFFIT SURVEYED
0DAYS OF FULL CAR PARK CLOSURE
14WEEKS, SURVEY TO HANDOVER

NEXT PROJECT

Column strengthening with CFRP

Jebel Ali · Structural strengthening

NEXT STEP

Facing something
similar?

Every building is different, but the questions are often the same. Let us take a look.

Request a site assessment

YOUR BUILDING, OUR NEXT CONVERSATION

Start with
a clear view.

Share the challenge. We will help you decide the next sensible move.

WHATSAPP