CONCRETE REPAIR
Marine quay wall restoration
Survey and repair of a concrete quay wall and fender piles exposed to tidal water, salt and marine growth.
- SECTOR
- Marine & waterfront
- DISCIPLINE
- Concrete repair
01 / THE SITUATION
Constant wetting, salt and marine growth had left the quay wall and its fender piles weathered, with coating loss and surface damage along the splash zone and the quay edge.
02 / SCOPE OF WORK
- 01
Close inspection of the wall, piles and quay edge to map cracking, spalling and coating failure.
- 02
Removal of marine growth and loose or failed material back to sound concrete.
- 03
Concrete repairs and protective treatment suited to a wet, salt-laden marine environment.
- 04
Works coordinated with the yard's ongoing marine and lifting operations.
FROM THE SITE / 06 PHOTOS





NEXT STEP
Facing something
similar?
Every building is different, but the questions are often the same. Let us take a look.
Request a site assessmentYOUR BUILDING, OUR NEXT CONVERSATION
Start with
a clear view.
Share the challenge. We will help you decide the next sensible move.